What makes compute actually run: power distribution, cabling and connectivity, cooling, and rack infrastructure. AI rack density has moved from a traditional 4-8kW to well past 30kW, so power and heat usually become the bottleneck before compute does. Power cable, high-speed copper and fibre must be sized backwards from the target density and link rate - carrying over legacy data-hall practice will not hold.