---
title: "Data Centre Infrastructure"
canonical: "https://www.kies.com.cn/en/categories/datacenter-infra"
lang: "en"
type: "product-family"
publisher: "Shanghai Paixu Network Technology Co., Ltd."
pricing: "mixed"
alternate: "https://www.kies.com.cn/zh/categories/datacenter-infra.md"
---

# Data Centre Infrastructure

> Source (canonical): https://www.kies.com.cn/en/categories/datacenter-infra
> Published by: Shanghai Paixu Network Technology Co., Ltd. — B2B supplier of AI devices and robotics
> Items stocked in this product family.
> Language: English · Also available in Chinese: https://www.kies.com.cn/zh/categories/datacenter-infra.md

## Overview

What makes compute actually run: power distribution, cabling and connectivity, cooling, and rack infrastructure. AI rack density has moved from a traditional 4-8kW to well past 30kW, so power and heat usually become the bottleneck before compute does. Power cable, high-speed copper and fibre must be sized backwards from the target density and link rate - carrying over legacy data-hall practice will not hold.

## Enquiries and technical support

Send the operating conditions — temperature, speed, load, and whether there is food or pharmaceutical contact. An engineer replies with a selection proposal and a written quotation within one business day.

- Enquiry form: https://www.kies.com.cn/en/contact
- Email: ai@kies.com.cn
- Phone: 021-80394405
